Friday, 11 November 2011

Reflections on the first half term

It's been a hectic half term. We've done about 60 inductions. We tailor our inductions by level and subject, in terms of introducing specific online resources and the way that we communicate. For example, for an Access to HE or Foundation degree group (who are typically mature students) we wouldn't labour the LRC rules (no eating, phones, two warnings then you have to leave and all that good stuff), we'd ask them to let us know if other students were distracting them by misbehaving. Our inductions are very hands on, with students searching and using the online resources and e-books. This engages the students and helps them learn how to find the resources at a later date. I believe the hands on use of e-books at induction embedded the use of e-books and led to us being #7 in the UK for use of the JISC e-books for FE package (in the stats that came out up to March 2011, weighted by size of college). On the feedback from the inductions 97% of students found them to be very or quite useful. So now the plan is to work on the other 3%!
We've also done Information Skills sessions for the first time this year. Session 1 covers effective web searching and evaluating web sources, Session 2 covers referencing, plagiarism adn bibliographies. These were delivered mostly through Xerte e-tutorials with LRC Support Tutors introducing the session and supporting students throughout. For next year I will modify this: the Second session was too advanced for Level 2 learners while some groups felt that they had nothing to learn on web searching. They do, but the question is how do you show students that they do? In the LRC survey in June I asked students about their level of confidence around study and information skills then asked staff about student ability in these areas. The results show that student confidence grossly outstripped the staff evaluation of their ability. This is a challenge to overcome for all FE and HE institutions - how do you make someone learn something that they believe they already know?
We've had quite a few procedural changes that began in September; we installed the MyPC computer booking system, started overdue charges and stopped teachers bringing classes in without booking. This has led to a few quarrels with those who haven't understood the new system (despite thorough communication and advertising) but it appears as if people are getting the hang of it now.
Previously we sent overdue reminder letters but there was no real sanction for not returning books on time, which meant that items were taken out at the start of the year and never seen again. This was very frustrating for other people who wanted to use the items. Now we charge 5- per day per item, and the MyPC system blocks students with overdue books from logging on to computers, unless they are in a booked class. This has led to much greater circulation of resources and less complaints about unfulfilled reservations.
Noise levels are a lot better which means less staff time managing behaviour. This means happier staff and more achieved in terms of stock promotion and tightening up things on the admin side of things. Things feel a lot more managed and contained which I thank MyPC for.

Monday, 6 September 2010

First day of term

We've been in the newly refurbished LRC for a week now. We're still ironing out little problems but we are just about there. My new part time member of staff has joined the team now which has allowed me to sort out rotas etc. Thankfully she is lovely and has lots of experience so she's been able to hit the ground running to some extent.

Last week was admin week so I had the chance to meet lots of the teaching staff as they called in to see how the refurb went. I've also been into two team meetings to promote the LRC, discuss the Independent Learning Sessions and the inductions. Speaking to a group of teachers is a bit nerve-wracking (as they are the experts at speaking to a group!) but I'm getting more comfortable with it.

The inductions have been fully planned and discussed with my team. The first sessions will be run tomorrow morning. The Independent Learning Sessions are also starting to take shape which is pleasing. They will begin running next Monday, I'm sure it'll be trial and error but the purpose and real value of them is becoming clearer which makes it easier to get teaching staff on board and to work out how to measure it.

It has all been somewhat overwhelming but exciting. I've had a lot to do but I'm making good progress and forming good relationships with other departments which is helping. That said, things can always be worse. I came in to college last Friday thinking 'my god, I've got so much to do, how will I cope?' and by lunchtime we were informed that Ofsted are coming in three weeks. So I've now got that to anticipate and prepare for.

I've been a bit negligent with Twitter and my RSS feeds while all this has been going on. I went back on today and am so impressed to see that in a week the need for action over the crisis in misrepresentation of public libraries has gone from a discussion to a campaign. I have so much respect for those who have taken the time to put together Voices for the Library. I'd love to get involved once I'm on the other side of Ofsted.

Friday, 13 August 2010

Good progress.

That seems to have been my catchphrase this week, I've said it to my LRC Support Tutor (the term we are using for Library Assistants) as we left almost every day. A lot has been sorted out but I still have to do lists long enough to need indexes!

I started the week off meeting with the Finance team to learn their systems. I felt the weight of my new budget holding responsibilities. I spent the rest of the day cataloguing, completing the policy for Independent Learning Sessions (a new initiative where each Level 2 and 3 class will have an hour week in the LRC supported by LRC staff) and creating lists of recommended websites for leaflets.

Tuesday was a dark day. I spent much of it wading through spreadsheets to try to understand my budget codes, and wading through processes and piles of paperwork. I also put in my first book order. Due to the refurb we are installed in a classroom at the moment, so not only am I learning new processes but I'm learning them outside of their natural habitat. To be honest it all got a bit much. Although, I also had a long chat with my former boss/mentor which was lovely, I still went home with the hump.

Wednesday was a new day! To start the day the LRC team were trained on the new printer/photocopier (the same model is already used elsewhere in the college). In the process of this print services reiterated their concern that the new printer won't fit in the space allocated to it in the new LRC. Worrying. Later I got a call that the mobile shelving was completed, so went along to the LRC with the H&S manager, refurb project manager and Head of Estates to have a demo and sign it off. It was the first time I'd been in the LRC since starting work here and it looks fantastic! There was a bit of squealing via the Twitter! In fact other staff saw how excited I was and the words 'sad' and 'geeks' were used. But then they haven't seen the shelves. In the afternoon my predecessor came in to answer my queries on the handover notes and other paperwork which was great and alleviated much of what was troubling me on Tuesday.

On Thursday I got IT to start the process of rebranding the libr.. sorry I mean LRC intranet pages. One of my team is working on typing up the corrections and reformatting the leaflets that need to be ready for induction and for uploading on the webpages. I spent much of the morning sorting out odds and ends that came up out of meeting with my predecessor yesterday. In the afternoon I had my official welcome from The Principal, although she has called in to visit a few times already. She's a big library advocate and has been very involved in the refurb. I then did some more work on our induction material, it's really coming together.

This morning I started by nagging IT a bit about the webpages. met with Print Services to look at the proposed printer space, and we feel confident it should fit, phew! I then met with Health and Safety to discuss risk assessments and potential problems on the horizon with the new shelving. the H&S manager said that he was surprised when he met me as he thought I'd be an older lady! This was partly a librarian stereotype and partly because of the degrees after my name. I was wearing a cardi, what more do people want? This afternoon I finally met with the head of IT who answered my questions. However he did say that there was a potential problem with the new monitors arriving, but we still *should* have them in time for the start of the new term.

As you can see it's been a pretty quiet week! I think I'm starting to get used to the commute too. Next week is our last week before the LRC is put back together so I want to get all the induction materials and leaflets finalised and the intranet pages as complete as possible. I also need to think of names for the bays in the LRC. At the moment they are down as Green 1, Green 2, Grey 1 and Grey 2. As I tweeted, I've been thinking about authors, local birds, or perhaps local well known people, can I get away with a Syd Barrett Bay?!

Friday, 6 August 2010

First week in first qualified job!

After the long process of interviews and seemingly endless applications here I am in my first qualified job as the LRC manager of a regional college in Cambridgeshire.

The first week has gone well. I had a hand over session with my predecessor a few weeks before starting, so I had the chance to do (lots of prep) at home of an evening and weekend. I came in on my first day with many pages of to do lists and lists of questions that I've slowly worked my way through.

As well as grappling with the usual new job business of learning names, procedures, a new LMS (AutoLib) these are the major challenges I'm facing at the moment:
  • Refurbishment. We are half way through a refurbishment at the moment. I met with the project manager earlier this week and it's all looking good to get the LRC ready for the start of term. At the moment we are temporarily installed in a classroom.
  • Change of use of LRC within the organisation. The library has been rebranded as an LRC, the major impact of which is that from September level 2 and 3 classes will be timetabled in for one session a fortnight of independent learning supervised by LRC staff. Therefore I need to get a procedure in place to make sure things run smoothly. This also means rebranding all leaflets, webpages etc. As part of this the Library Assistants were given redundancy notices and a new role of LRC Support Tutor was created which leads me to..
  • New staff. I manage 3 LRC Support Tutors, 1 full time, 2 part time. Only 1 of the part timers are existing staff. In a way this is good as it means we can develop the new service together rather than having staff who are stuck in their ways. However, being told on my first day that I have to train new staff immediately when I wasn't expecting them for a month wasn't ideal. Especially when we aren't even in the LRC.
  • Responsibility. I haven't been a budget holder before which is a little daunting, but I have a meeting on Monday to get fully up to speed on it.
  • The commute. I now have a commute of 3 to 3 and a half hours a day round trip whereas my last job was 20 minutes up the road. I'm enjoying having time to get reading done and trying to see it positively. We plan to relocate soon so it's only a temporary situation.
  • Inductions. My predecessor had been in post since 1976, and didn't leave any induction materials as she did it off the top of her head. This leaves me creating induction materials for an LRC that I haven't worked in yet and that is currently gutted.

Plenty to keep me out of trouble then! Exciting times ahead.